Current Alerts and Notices (View all)

Road conditions(2)

Dunedin City Council – Kaunihera-a-rohe o Otepoti

Building Services

2025/26 (GST Inclusive)

Building Services

Building Application Costs
Costs payable are made up of a number of components including checking, processing, administration costs and an assumed number of inspections. Code compliance certificates are additional. Further charges may also apply
Building Consent Application -  Residential (estimates)
As per schedule B
Building Consent Application - Commercial (estimates)
As per schedule B
Levies
BRANZ Building Research Levy - Projects at and over $20,000 ($1.00 per $1,000 of building work)
MBIE Building Levy - Projects at and over $65,000 ($1.75 per $1,000 of building work)
BCA Accreditation Levy payable on all building consent applications including amended and staged applications ($0.50 per $1,000 of building work, minimum fee $10 - Non-refundable) $0.50

Schedule B: Indicative charges for complete building consent applications 2025/26 (levies additional)

Building Consent Application - Residential

  Processing time @
$230 per hour
Checking/ Admin time @ $130-$165 per hour Inspection deposit @ $235 per inspection 2025/26 PIM/PCON2025/26 Code Compliance Certificate
New Construction – Residential
Erect Single Level Dwelling 8 - 15 hours 1 - 3 hours 12 $825.00 $352.50
Erect Multiple Level Dwelling (including Basement) 10 - 17 hours 1 - 3 hours 15 $825.00 $470.00
Multi-Unit Development (Single Level) Per Unit 8 - 15 hours 1 - 3 hours 12 $500.00 $352.50
Multi-Unit Development (>1 Level) per Unit 8 - 15 hours 1 - 3 hours 13 $500.00 $470.00
Erect Garage/Carport/Shed (Non-Habitable) 2 - 5 hours 0.5 - 2 hours 5 $610.00 $235.00
Erect Habitable Garage/Sleepout  5 - 9 hours 0.5 - 2 hours 8 $825.00 $235.00
Relocate Dwelling 5 - 13 hours 1 - 3 hours 4 $825.00 $235.00
Additions and Alterations – Residential
Alter Dwelling less than $20,000 3 - 5 hours 0.5 - 2 hours 6 $610.00 $235.00
Alter Dwelling $20,000 to $100,000 5 - 11 hours 0.5 - 2 hours 8 $825.00 $235.00
Alter Dwelling  $100,000 to $500,000 8 - 15 hours 0.5 - 2 hours 10 $825.00 $235.00
Alter Dwelling over $500,000 10 - 17 hours 1 - 3 hours 12 $825.00 $235.00
Other – Residential
Erect Deck 3 - 6 hours 0.5 - 2 hours 2 $610.00 $117.50
Install Sump/Mud Tank 1 - 3 hours 0.5 - 2 hours 1   $117.50
Foul/Stormwater Drainage (including Septic Tank) 2 - 5 hours 0.5 - 2 hours 2 $610.00 $117.50
Retaining Walls (Specific Design) 2 - 5 hours 0.5 - 2 hours 2 $610.00 $117.50
Reclad Existing Building 2 - 5 hours 0.5 - 2 hours 2   $117.50
Reroof 1 - 3 hours 0.5 - 2 hours 2   $117.50
Minor alteration < $10,000.00 including installation of wet area shower 2 - 5 hours 0.5 - 2 hours 3   $117.50
Remove Internal Wall 2 - 5 hours 0.5 - 2 hours 1   $117.50
Solid Fuel Burner (domestic only) 1 - 3 hours 0.5 - 2 hours 1   $117.50
Swimming Pool Fences 1 - 3 hours 0.5 - 2 hours 1   $117.50
Pole/Veranda Signs 1 - 3 hours 0.5 - 2 hours 1   $117.50
Minor Plumbing, Installation of new fitting 1 - 3 hours 0.5 - 2 hours 2   $117.50
Demolish Residential Dwelling (more than three storeys) 1 - 2 hours 0.5 - 2 hours 1 $380.00 $117.50
 

Building Consent Application - Commercial

  Processing time @
$245 per hour
Checking/ Admin time @ $130-$165 per hour Inspection deposit @ $250 per inspection 2025/26 PIM/PCON2025/26 Code Compliance Certificate
New Construction – Commercial
New Single Level Commercial Building 12 - 25 hours 2 - 5 hours 14 $855.00 $1,000.00
New Multi-Level Commercial Building 25 - 45 hours 2 - 6 hours 24 $1,077.50 $1,000.00
Complex, Institutional or High Rise Building 45+ hours 6+ hours 24+ $1,077.50 $1,000.00
Erect Garage/Carport/Shed (Non-Habitable) 2 - 5 hours 0.5 - 2 hours 5 $632.50 $500.00
Additions and Alterations – Commercial
Alterations to Existing Building (Single Floor) 5 - 13 hours 2 - 5 hours 4 $632.50 $1,000.00
Alterations to Existing Building (Single Floor) including Plumbing and Drainage 8 - 15 hours 2 - 5 hours 7 $855.00 $1,000.00
Alterations to Existing Building (Multi Level) 10 - 17 hours 2 - 5 hours 4 $732.50 $1,000.00
Alterations to Existing Building (Multi Level) including Plumbing and Drainage 12 - 25 hours 2 - 5 hours 7 $1,077.50 $1,000.00
Demolition – Commercial
Demolish Commercial Building (per building) 1 - 4 hours 0.5 - 2 hours 1 $387.50 $1,000.00
Drainage seal off may be required and incurs a fee
Temporary Structures – Commercial
Marquee 1 - 4 hours 0.5 - 2 hours 1 $287.50 $125.00
  2025/26 (GST Inclusive)
Amusement Device (set by Amusement Device Regulations 1978)
One amusement device, for the first seven days or part thereof $11.50
Each additional device for first seven days or part thereof – same owner $2.30
For each device $1.15 GST inclusive for a further seven days or part thereof $1.15
  2025/26 (GST Inclusive)
Sewer Connections – Foul and Stormwater 
Standard Connection fee 100mm diameter (Sewer Connections – per connection ) $620.00
Standard Connection fee 150mm diameter (Sewer Connections – per connection) $905.00
Connection fee greater than 150mm diameter (Sewer Connections – per connection)  As quoted by 3 Waters on application
Seal Off  - DCC contractor to excavate $1,860.00
Seal Off - Drain layer to excavate $285.00
Private Foul and Stormwater Drain in Common
Application for Private Foul and Stormwater Drain in Common  $230.00
Plus joining fee for each party $97.00
Disconnection notification from drain-in-common filing fee $97.50
  2025/26 (GST Inclusive)
Allanton – New Wastewater Reticulated Services
Capital Joining Fee Pressure Sewer System $10,500.00
Installation Fees will vary according to the market rate at the time of purchase of pump unit, chamber, control panel and ancillary equipment for that property. The fee will be quoted by 3 Waters on application
  2025/26 (GST Inclusive)
Building Infringement Offences and Fees (set by Building Act 2004)
Failing to supply territorial authority with a building warrant of fitness (section 108(5)(aa)) $1,000.00
Failing to display a building warrant of fitness required to be displayed (section 108(5)(a)) $1,000.00
Displaying a false or misleading building warrant of fitness (section 108(5)(b)) $1,000.00
Displaying a building warrant of fitness other than in accordance with section 108 (section 108(5)(c)) $1,000.00
Failing to comply with the requirement to obtain a compliance schedule (section 101) $250.00
Failing to comply with the requirement that building work must be carried out in accordance with a building consent (section 40) $1,000.00
Failing to apply for a certificate of acceptance for urgent building work as soon as practicable after completion of building work (section 42) $500.00
Failing to comply with any other notice to fix (section 168(1)) $1,000.00
Failing to comply with a notice, within the time stated in the notice, requiring work to be carried out on a dangerous or insanitary building (section 124) $1,000.00
Failing to comply with a notice to fix in relation to means of restricting access to a residential pool (section 168(1AA)) $500.00
Supplying a pool product without an approved notice (section 162E) $500.00
Person who is not licensed building practitioner carrying out restricted building work without supervision of licensed building practitioner with appropriate licence (section 85(1)) $750.00
Licensed building practitioner carrying out restricted building work without appropriate licence (section 85(2)(a)) $500.00
Licensed building practitioner supervising restricted building work without appropriate licence (section 85(2)(b)) $500.00
Person holding himself or herself out as being licensed to do or supervise building work or building inspection work while not being so licensed (section 314(1)) $500.00
Using, or knowingly permitting the use of, a building for a use for which it is not safe or not sanitary (section 116B(1)(a)) $1,500.00
Using, or knowingly permitting the use of, a building that has inadequate means of escape from fire (section 116B(1)(b)) $2,000.00
Using, or permitting use of building having no consent or code compliance certificate or certificate for public use for premises for public use (section 363) $1,500.00
Using or occupying a building, or permitting another person to do so, contrary to a territorial authority’s hoarding, fence, or notice (section 128A(2)) $2,000.00
Failing to complete seismic work by deadline (section 133AU(1)) $1,000.00
Failing to comply with requirement to attach EPB notice or EPB exemption notice (section 133AU(2)) $1,000.00
Failing, when EPB notice or EPB exemption notice ceases to be attached or becomes illegible, to notify the territorial authority (section 133AU(3)) $1,000.00
Using or occupying an earthquake-prone building, or permitting another person to do so, contrary to a territorial authority's hoarding, fence, or notice (section 133AU(5)) $2,000.00
Wilfully obstructing, hindering, or resisting a person executing powers conferred under the Act or its regulations (section 367) $500.00
Wilfully removing or defacing a notice published under the Act or inciting another person to do so (section 368) $500.00
Failing to provide prescribed checklist (section 362D(4)) $500.00
Failing to provide prescribed disclosure information (section 362D(4)) $500.00
Failing to have a written contract as prescribed (section 362F(4)) $500.00
Failing to provide prescribed information or documentation to specified persons (section 362T(4)) $500.00
Supplying, offering to supply, or advertising the supply of building products in New Zealand without complying with prescribed information requirements (section 362VB(2)(a) to (c)) $1,000.00
Importing building products into New Zealand for the purpose of supply without complying with prescribed information requirements (section 362VB(2)(d)) $1,000.00

Development Contributions

Your application may also be required to pay development contributions under the Council’s Development Contributions Policy. For more information please ring 03 477 4000 and ask to speak to the Development Contributions Officer, or email  development.contributions@dcc.govt.nz.

Still didn't find what you were looking for?